I nearly always put a CONTINUE statement before a PAUSE in any job. Over the years I have discovered that sometimes the CPU waits "longer" than the specified pause and fails with an error. (Or you can duplicate this by doing a SUSPENDJOB on a job in the middle of a PAUSE then do a RESUMEJOB after the specified time.)
:PAUSE 5
^
Number of pause seconds is out of range. (CIERR 9030)
REMAINDER OF JOB FLUSHED.
A mere CONTINUE statement would have prevented this.
I brought this up for general reading because I found it in generated JCL, I had it recompied with embedded CONTINUE statements in the right places.
Tracy Johnson
Business Analyst
Measurement Specialties, Inc.
Office (757) 766-4318
Cell (757) 755-6470
[log in to unmask]
* To join/leave the list, search archives, change list settings, *
* etc., please visit http://raven.utc.edu/archives/hp3000-l.html *