That is great but then another job with a function like jobcnt can not see
the current status. I am switching to use the MPEX approach.
-------------------------------------------------
Larry Simonsen Phone: 801-437-3737
Flowserve Corporation Fax: 801-491-1750
505 E. Technology Ave http://www.Flowserve.com
Bldg. C, Suite 3100 e-mail: [log in to unmask]
Orem, UT 84097
-------------------------------------------------
All opinions expressed herein are my own and reflect, in no way, those of my
employer.
-----Original Message-----
From: Jonathan M. Backus [mailto:[log in to unmask]]
Sent: Monday, October 22, 2001 3:41 PM
To: [log in to unmask]
Subject: Re: jobname change
Paul,
Actually that is the approach I have usually taken. Not only does
it give
you status updates but by including data/time stamps you can review the
history to see how much time was at each step. Also, by going to a file you
can review even further back to previous runs to get a more intrinsic feel
for how the process is doing over a period of time and multiple executions.
Thanx,
Jon
-----Original Message-----
From: HP-3000 Systems Discussion [mailto:[log in to unmask]]On
Behalf Of Paul H Christidis
Sent: Monday, October 22, 2001 5:29 PM
To: [log in to unmask]
Subject: Re: jobname change
Wouldn't be easier (no need for special PM programming) to have the job use
a series of 'echo' commands and report its progress into some predetermined
file that can then be viewed?
Regards
Paul Christidis
Larry,
Once worked with a chap (back-in 1988/89 at Slough, England) who used PM
Debug to change session/job names when he was waiting for a compile to
finish. Can't remember which system table he was hitting but if he's on
this
list then the details I've supplied should jog his memory and he may
contact
you directly.
regards,
+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+
|Robert W.Mills (Systems Development Manager) |
-----Original Message-----
From: Simonsen, Larry [mailto:[log in to unmask]]
Sent: 22 October 2001 15:21
To: [log in to unmask]
Subject: jobname change
Is there a good way for a job to change its job name. This would be used
to
signal the states that a job is in. in the specific case I wish to change
the backup job name form backup to verify to signal that the backup has
completed and we are now reading the tape to verify it is readable.
-------------------------------------------------
Larry Simonsen Phone: 801-437-3737
Flowserve Corporation Fax: 801-491-1750
505 E. Technology Ave http://www.Flowserve.com
Bldg. C, Suite 3100 e-mail: [log in to unmask]
Orem, UT 84097
-------------------------------------------------
All opinions expressed herein are my own and reflect, in no way, those of
my
employer.
* To join/leave the list, search archives, change list settings, *
* etc., please visit http://raven.utc.edu/archives/hp3000-l.html *
* To join/leave the list, search archives, change list settings, *
* etc., please visit http://raven.utc.edu/archives/hp3000-l.html *
* To join/leave the list, search archives, change list settings, *
* etc., please visit http://raven.utc.edu/archives/hp3000-l.html *
* To join/leave the list, search archives, change list settings, *
* etc., please visit http://raven.utc.edu/archives/hp3000-l.html *
|