I was just compiling some code with the list option of: date/c.
I got: 101497, not the 19971014 that I was expecting. Anyone else run into this
or have a patch number?
Ken Sletten?? Steve?? anyone!?!
Kevin "thought I had the year 2000 covered" Newman
ps. MPE 5.0 pp6