Hi All,
We have a schedule setup in conman with two jobs and the schedule
status shows an ABEND. But, the status of the jobs, as seen in
jobrescue(status), shows that the jobs have completed successfully.
Can anyone let me know how to check why the sched really got to the
'abend' state. I am on MPE 6.0. Thanks in advance for any help.
Regards,
Pankaj
* To join/leave the list, search archives, change list settings, *
* etc., please visit http://raven.utc.edu/archives/hp3000-l.html *