On 10/31/07, Jim McDermott <[log in to unmask]> wrote:
> Hello all:
>
> This is a real quick question concerning jobs that are in the WAIT state after
> installing MPE/iX 6.0 from a CSLT for a Disaster Recovery exercise. After
> system is
> installed, I have tried to stream a job that builds the volumes/volume sets but
> it just goes into a WAIT state. In fact, any job I try streaming has the
> same problem. I'm logged on as MANAGER.SYS and job limit is set to 13 in
> jobstream. I tried HIPRI but nothing works. I wind up having to manually
> issue the commands to do the builds and after a reboot, the scheduler has no
> problem for streaming thereafter. Is there a command that I need to issue?
is LP spooled? - d
* To join/leave the list, search archives, change list settings, *
* etc., please visit http://raven.utc.edu/archives/hp3000-l.html *