I just got off of the phone with the HPRC and Contract Support. I ordered
the upgrade tapes so we can get off of MPE/iX 5.5 and go to 6.0 (5.5 support
ends on 12/31/2000). I was told that it can take up to two weeks for the
tapes to get here (by December 18th if ordered today), which puts it pretty
close to the end of the month (and all those holidays). So, if there are
any other procrastinators out there, better get a move on!
Jim Phillips Information Systems Manager
Email: [log in to unmask] Therm-O-Link, Inc.
Phone: 330-527-2124 P. O. Box 285
Fax: 330-527-2123 10513 Freedom Street
Web: http://www.tolwire.com Garrettsville, OH 44231