HP3000-L Archives

March 2016, Week 1

HP3000-L@RAVEN.UTC.EDU

Options: Use Monospaced Font
Show Text Part by Default
Show All Mail Headers

Message: [<< First] [< Prev] [Next >] [Last >>]
Topic: [<< First] [< Prev] [Next >] [Last >>]
Author: [<< First] [< Prev] [Next >] [Last >>]

Print Reply
Subject:
From:
Craig Lalley <[log in to unmask]>
Reply To:
Craig Lalley <[log in to unmask]>
Date:
Fri, 4 Mar 2016 13:50:48 +0000
Content-Type:
text/plain
Parts/Attachments:
text/plain (13 lines)
OK Guys, 

Sorry for the ON-topic post.   (BTW, two "guys"  from this list attempted to climb Mt. Hood on last Thursday)
Question:   I have multiple HP3000's, sharing 1 DTC.   The problem is, who controls the DTC?   In the event of 
a power cycle, there is a race setup for which HP3000 will download the new configuration.   I need system A to be "in-charge".
However, systems B or C will most likely download first.   Leaving me with a manual step of unplugging the network from B and C, power cycle the DTC and wait for the A-class to download the configuration.
Is there anything that can be done to just leave the A-system in charge?
-Craig


* To join/leave the list, search archives, change list settings, *
* etc., please visit http://raven.utc.edu/archives/hp3000-l.html *

ATOM RSS1 RSS2