HP3000-L Archives

December 2003, Week 4

HP3000-L@RAVEN.UTC.EDU

Options: Use Monospaced Font
Show Text Part by Default
Show All Mail Headers

Message: [<< First] [< Prev] [Next >] [Last >>]
Topic: [<< First] [< Prev] [Next >] [Last >>]
Author: [<< First] [< Prev] [Next >] [Last >>]

Print Reply
Subject:
From:
Denys Beauchemin <[log in to unmask]>
Reply To:
Denys Beauchemin <[log in to unmask]>
Date:
Thu, 25 Dec 2003 12:25:50 -0600
Content-Type:
text/plain
Parts/Attachments:
text/plain (90 lines)
No Mars signal from the Beagle probe.  (Yet.)

http://news.bbc.co.uk/2/hi/science/nature/3344693.stm


Denys

-----Original Message-----
From: HP-3000 Systems Discussion [mailto:[log in to unmask]]On
Behalf Of Wirt Atmar
Sent: Wednesday, December 24, 2003 1:46 PM
To: [log in to unmask]
Subject: [HP3000-L] OT: Christmas Day on Mars

We're on our way to Mars again. The Beagle II, named after Darwin's ship
of
discovery and now part of the European Space Agency's Mars Express
spacecraft,
is scheduled to land on Mars tomorrow, on Christmas Day.

It is my understanding that a successful landing will be announced with
the
words, "The Beagle has landed."

Wirt Atmar

=======================================

ESA News
<A HREF="http://www.esa.int">http://www.esa.int</A>

24 December 2003

Mars Express status report ...

At 09:30 CET today [0830 UTC], the Mars Express orbiter was 200,000
kilometres
from Mars and 156,000,000 kilometres from Earth. The orbiter is on its
final
planned course for Mars Orbit Insertion (MOI).

The spacecraft will hit its intended MOI 'bull's eye' point, 414
kilometres
above the Martian surface, to within an accuracy of six kilometres.

The retargeting manoeuvre performed by ESOC Mission Control on Saturday,
20
December, was so accurate that the additional 'fine-tuning' manoeuvre
scheduled
for 23 December was judged to be unnecessary and not performed.

Mission Control is currently placing the spacecraft in its final
configuration
for MOI. The fuel tanks are being heated and the latch valves checked in
preparation for a 34-minute main engine burn, due to place the
spacecraft
into
Martian orbit in the early hours of Christmas morning.

All non-essential equipment is currently being turned off to minimise
the
possibility of the spacecraft entering 'safe mode'. This process is due
to
conclude around 12:00 CET [1100 UTC] when the spacecraft's Solid State
Mass
Memory is switched off. No further commands are due to be sent to Mars
Express
until after MOI.

Flight Director Michael McKay said, "From this point the tension really
starts
to grow. We don't have a lot more to do except watch and wait. The time
within
which we can do something reduces very rapidly.

"But if anything unexpected does occur then we would be ready to jump in
and
recover the situation, applying all the professionalism and skill of the
ESA
and
industrial teams gathered here at ESOC Mission Control."

========================================

* To join/leave the list, search archives, change list settings, *
* etc., please visit http://raven.utc.edu/archives/hp3000-l.html *

* To join/leave the list, search archives, change list settings, *
* etc., please visit http://raven.utc.edu/archives/hp3000-l.html *

ATOM RSS1 RSS2