I need to do y2k testing, and would like some feedback. Our shop does't
have a test machine. We want to do this testing on a Satrurday, after
we do a full backup of the entire system. Part of the testing will
involve changing the system date to 01/01/2000, and testing production
jobs. Is the appropriate way to go back to reload the operating system
from a slt tape, and then just do a reload of @[log in to unmask]@?
Thanks Lance