Hi all,
since yesterday I have a problem with a BusinessBasic programm.
The function VAL$(1.2) give me the Returnvalue 1.19950848 !!
The programm was compiled and linked on another machine (HP917 / MPE/iX
4.0).
The Business Basic /iX (HP32715A.00.09)-Interpreter shows
also an incorrect Value.
VAL$(89.02)
> 89.04278912
The BusinessBasic/V -Interpreter shows the correct value.
Any ideas ??
Jürgen